GAUGES
Select a system:  
Gauges

Adding a Single Gauge to the Vnet System  
  1. Determine the mounting location of the gauge.
    Note: Gauges must correspond to sensors that are currently installed on the G2X Vnet system.
  2. Connect the Gauge Tee Cable to the gauge.
  3. If the 24” Gauge Tee Cable will not reach a location on the AUX to Vnet cable in which it may be connected, it will be necessary to utilize Vnet Extension cables
  4. Complete final connection of all cables.


Adding Multiple Gauges to the Vnet System  
Following the previous instructions, simply mount the additional gauges and connect each gauge to the next gauge, through the use of Gauge to Gauge cables. The last gauge connects to the AUX to Vnet cable by means of the Gauge Tee Cable.


Gauge Installation Tips
  1. Multiple gauges may be installed in any order
  2. Each gauge arrives with instructions concerning required software updates. View Example


Purchase Items Required for Adding a Gauge to a Vnet System
  1. Vnet Gauge
  2. Gauge Tee Cable
  3. Gauge to Gauge cable (for multiple gauges)


MSD PERFORMANCE COMPANIES
MSD Ignition MSD Fuel Injection Racepak Data Systems Edge Products Superchips
30402 Esperanza, Rancho Santa Margarita, California 92688 • Phone: 949-709-5555 • Fax (949) 709-5556
All text, descriptions, software, images, and other content of this website are the property of Competition Systems, Incorporated. All rights reserved.